8
DISASSEMBLY PROCEDURE
8-1. CONTROL BOX
OPERATING PROCEDURE
1.Removing the control box cover
(1) Remo
ve the covers two fixing screws (A) and remove the
cover.
2.Re-fit
(1) Re-fit in reverse order, be sure not to catch wires when
re-fitting.
8-2. THERMISTOR (Liquid piping temperature detection)
OPERATING PROCEDURE
1.Removing the pipe fixing cover
(1) Remove
the covers three fixing screws (B) and remove the
cover.
2.Removing the thermistor
(1) Remove the thermistor from the thermistor holder which is
installed on the copper tube.
3.Re-fit
(1) Re-fit in reverse order.
Be careful on removing heavy parts.
PHOTOS
fig.1
(A)
fig.2
PHOTOS
fig.1
(B)
Drain pan
18