4.
The mainsail outhaul primarily cleats at the boom, (fig 5) but passes thru a deckeye
just behind the main mast, down to the console and turns through the boom vang/outhaul
double becket block and back to the central of the 3 clamcleats on the port side of the con-
sole. (fig 6)
Fig. 5
5.
The jib is self tacking with a diagonal
strut between the clew and a claw at the
mast which holds the jib flat and prevents
twisting as the sheet is eased. (fig 7, view)
Fig. 7
6.
The jib sheet is 2 part which gives the option of
one end going to a servo assist winch and the other
down to the camcleat on the starboard side of the
console for manual operation. (fig 8 shows the jib
sheet winch behind mast, jib sheet and camcleat).
Fig. 8
10
Fig. 6